Wakendaw and Point Pleasant - AMPR
Project Manager:
Emily Raby

Description:
Project consists of 3,431 linear feet of drainage pipe infrastructure rehabilitation or replacement work needed as a result of the Asset Management pilot study. Survey and design work for bid process specifications are included in improvement cost. Project is being split into multi phase project for feasibility. Project also includes rehabilitation or replacements in Hamlet Square Subdivision. Project has been moved up in priority ranking due to recent inspection data and pipe failure rate increase.

Resources:

Videos
Budget

Whipple Road Subdivision - Asset Management Pipe Replacements
Project Manager:
Emily Raby

Description:
Project consists of an estimated 2,378 linear feet of drainage pipe infrastructure rehabilitation or replacement work needed as a result of the Asset Management pilot study. Survey and design work for bid process specifications are included in improvement cost. Subdivisions in this project area include Candlewood, Coopers Point, Coopers Landing, Landings Run, and Glenn Lakes. This project is being broken down into two phases for feasibility.

Resources:
Videos
Budget

Snee Farm Outfall
Project Manager:
Hillary Repik

Description:
Project consists of an estimated 2,378 linear feet of drainage pipe infrastructure rehabilitation or replacement work needed as a result of the Asset Management pilot study. Survey and design work for bid process specifications are included in improvement cost. Subdivisions in this project area include Candlewood, Coopers Point, Coopers Landing, Landings Run, and Glenn Lakes. This project is being broken down into two phases for feasibility.

Resources:
Videos
Budget

Hickory Shadows & Rosemead - Asset Management Project
Project Manager:
Emily Raby

Description:
Project consists of 5,274 linear feet of drainage pipe infrastructure cleaning, inspections, and rehabilitation or replacement work needed to conduct the next phase of the Asset Management program. GIS asset data collection, survey and design work for bid process specifications are included in improvement cost. Project assumes 30% of inspected pipe will require repair/ rehabilitation.

Resources:
Videos
Budget

Snee Farm - SRF
Project Manager:
Emily Raby

Description:
Project is combining several previous CIP projects for infrastructure rehabilitation, improvements, and water quality into a single project. A funding source has been identified that will allow the Town to conduct the smaller projects at one time. The project involves engineering studies to identify flood related improvements, water quality improvement retrofits, and infrastructure failures. Prior Projects were Snee Farm; Engineering and surveys (#3), Longpoint Basin (#14), Whipple-Indigo Basin (#8), AMP - CIR (#15), Lakes Outfall (#7), and Drainage Canal restoration (#10). The area has numerous canals and pipe systems which are in failure and contribute to area flooding problems, in addition to being in a water quality priority area that requires the Town to assess and implement protective measures.

Resources:
Videos
Budget

Drainage Canal Restoration
Project Manager:
Hillary Repik

Description:
Project is to survey and restore or stabilize 18,850 linear feet of primary drainage canals that have been identified critical issues during the Town's annual drainage canal inspection program. The area includes canals that have been identified as having erosion issues, access issues, easement issues, or flow issues due to increases in development and changes in several drainage basins throughout the Town. Canals identified in the Phase I Restoration Project Areas are: Shemwood II canal, Cassina Plantation Canals, Sloan Park Canal, Mill Tract Canal, Goblet Canal, Waters Edge Swale reconstruction, Parish Place Canal, Runaway Bay Canal, and the Greenhill Canal(s). Project would include obtaining canal surveys and engineering for rehabilitation project designs and specifications needed for bid process to update asset management and GIS files for NPDES operations.

Resources:
Videos
Budget

Pitt Street District Storm Lines
Project Manager:
Emily Raby/Ken Rhye

Description:
Project would fund the replacement and/ or upgrading of existing stormwater infrastructure that is undersized and collapsing. Water Quality improvements should be considered.

Resources:
Videos
Budget

Wando East/Wando Lakes
Project Manager:
Emily Raby

Resources:
Videos
Budget

Rivertowne on the Wando Pipe Repair
Project Manager:
Emily Raby

Resources:
Videos
Budget

Old Village Stormwater Assessment
Project Manager:
Ken Rhye

Resources:
Videos
Budget