Description
This project will replace dehumidification and temperature control system for the pool air and water in accordance with any new code upgrades affecting duct size, airflow, etc., replace exterior doors and closers to include electronic keyless entry system, repair air handling unit above ceiling in conference room, replace gym lighting with LED fixtures, replace gym floor, replace entire storefront and lobby redesign, and replace HVAC for facility.
Status
Design phase
Cost
Total Project Cost: $1,709,605
- Previous funding: $429,500
- Fiscal year 2018: $170,652
- Fiscal year 2019: $257,500
- Future years (unfunded): $851,953
Contact
Jimmy Millar, Project Manager