Hamlin Trail

HAMLIN BANNERDescription

The Hamlin Trails project is a proposed 10ft concrete multiuse path along Rifle Range Rd from the existing Rifle Range Trails parking area to the US 17 to Rifle Range Rd Connector project multiuse path. This segment will utilize much of the existing Berkeley Electric Coop overhead powerline easement and is intended to include a bridge feature across an existing drainage canal. This project was selected by the South Carolina Recreational Trails Program (SCRTP) grant for $100,000.00 to assist with construction. Further funding for the project was allotted through the Liberty Hill Development Impact Assessment process.

Schedule

  • Design Complete:  August 2023
  • Begin Construction:  January 2024
  • Complete Construction:  May 2024

Cost:  

  • $475,000

Resources

Hamlin Trail Project Area Map