DescriptionA 10ft concrete multiuse path is proposed along Hungryneck Blvd as part of a larger corridor safety improvement project from the IOP Connector to the Carolina Towne Ct. This trail is proposed on the Town Centre (west side) of Hungryneck Blvd and will replace the existing sidewalk. The project is currently at the 30% design plan phase and is going through the Town's Design Review Team (DRT) process for permitting. Staff has applied for both TST and CTC funds to construct this project.
Schedule- Complete Design: July 2022
- Begin Construction: TBD
- Complete Construction: TBD
Cost
|